projects

ABU DHABI AIRPORT - NEW TERMINAL ACCESS STRATEGY

<p><span style="font-size:18px"><strong>TRAFFIC &amp; HIGHWAYS STUDY</strong></span></p> <p>ADAC have retained M/s ARUP to prepare a Traffic Master Plan for Abu Dhabi Airport to address the impact of the New Planned Terminal on the adjacent and surrounding road networks. AEC have been retained by the Project Consultant to prepare the Concept Design for the New Interchange planned to provide access for the New Terminal as well as modifications of the existing interchange to the existing terminal.<br /> &nbsp;</p> <p><strong>Key Services :</strong></p> <ul> <li>Develop roadway network associated with traffic model.</li> <li>Develop access strategy for the new terminal.</li> <li>Develop improvements to the existing roads and interchanges.<br /> &nbsp;</li> </ul> <table border="0" cellpadding="0" cellspacing="0"> <tbody> <tr> <td> <p><strong>Client</strong></p> </td> <td> <p>:</p> </td> <td> <p>Abu Dhabi Airports Company (ADAC)</p> </td> </tr> <tr> <td> <p><strong>Location</strong></p> </td> <td> <p>:</p> </td> <td> <p>Abu Dhabi, UAE</p> </td> </tr> <tr> <td> <p><strong>Appointment</strong></p> </td> <td> <p>:</p> </td> <td> <p>Traffic and Highways</p> </td> </tr> <tr> <td> <p><strong>Construction Value</strong></p> </td> <td> <p>:</p> </td> <td> <p>Study</p> </td> </tr> <tr> <td> <p><strong>Project Status</strong></p> </td> <td> <p>:</p> </td> <td> <p>Completed</p> </td> </tr> </tbody> </table>
Talk To AEC
user
Aqleh Engineering Consultant
Contact Us

Here’s your contact at AEC:

user
Aqleh Engineering Consultant
Contact Us