projects

ROUTE 2020 DUBAI METRO RED LINE

<p><span style="font-size:18px"><strong>HIGHWAYS &amp; UTILITIES DESIGN</strong></span></p> <p>RTA is developing a Metro Link between the existing Dubai Metro Red Line at Nakheel and Harbour Station and the Expo 2020 site near Al Maktoum International Airport. The connection is 14km of track of which 11km is elevated and 3km is underground. Once developed the Metro Link will provide seven stations. AEC was commissioned to undertake the following key services:<br /> &nbsp;</p> <p><strong>Key Services :</strong></p> <ul> <li>Redesign the roads network along the tram alignment.</li> <li>Develop the integration of the proposed metro stations with the surrounding road networks and public transit systems including the access, drop off, parking lots and bus and taxi stops.<br /> &nbsp;</li> </ul> <p><strong>Client </strong>: Roads and Transport Authority (RTA)</p> <p><strong>Location </strong>: Dubai, UAE</p> <p><strong>Appointment </strong>: Highways &amp; Utilities</p> <p><strong>Construction Value</strong> : AED 220 Million&nbsp;</p> <p><strong>Project Status</strong> : Completed</p> <p>&nbsp;</p>
Talk To AEC
user
Aqleh Engineering Consultant
Contact Us

Here’s your contact at AEC:

user
Aqleh Engineering Consultant
Contact Us